Updated: 2023-05-09
---
![[AIC Timeline.png|300]]
## Pre-Commit
Prior to the commit call, the AIC will be making picture calls. These calls are intended to build SA for the fighters and simply consist of the total number of groups and bullseye callouts to the three highest factor groups.
The AIC will make a picture call every minute. These calls always begin with the callsign of the AIC, and hearing that should key the fighters that an AIC call is coming.
Friendly fighters must be committed any time a group reaches the NLT commit range.
During DCA operations, commit authority usually resides with the AIC. During strike operations, commit authority for sweeps/shields in the strike package resides with the strike package commander.
## Commit Call
Once the decision is made to commit the fighters, a picture commit call will be made.
This call starts like a normal picture call, except there will only be one group given, and after that bullseye call the AIC will call “`[Callsign]` Commit]”.
Once hearing a commit, fighters must locate the group and rapidly (read tac form) place the group off their nose.
If the fighters need a BRAA call to localize the group, they should call “`[Callsign]`, Commit, BRAA” and the AIC will immediately provide an abbreviated BRAA call to the commit group.
>[!example]+ Commit
>“`[Callsign]`, Commit, (Optional: BRAA)"
>>[!quote]
>`A/C`: “Victory-1, Commit”
>>or
>>`A/C`: “Victory-1, Commit, BRAA”
>>==AIC==: "Victory-1, BRAA 248/80"
## Post-Commit Call
Although only a single group was called in the commit call, fighters are not committed to groups, they are committed to pictures.
The post-commit call describes to the fighters the picture they have been committed to and must be completed prior to Tac Range.
In the post commit call, the AIC will LABEL the picture and NAME the groups.
The post commit call is in picture format, but all factor groups in the picture will be mentioned. (If there are non-factor groups, leading edge or exclusion rules will be applied). All groups will be given names, and labels applied to any shapes in the picture.
![[AIC Timeline.png|300]]
## Commit Example
>[!quote]- Pre-commit (1/min):
> ![[Pasted image 20230811210210.png|350]]
> ==AIC==: “Closeout, two groups, group rock 250/30, 22k, track south east, Hostile, Flogger, group rock 265/46, 6k, track west, Hostile, Flanker”
>[!quote]- Commit (NLT commit range):
![[Pasted image 20230811211050.png|350]]
==AIC==: “Closeout, two groups, group rock 240/35, 22k, track south, Hostile, Flogger, Victory-1 Commit”
Victory requests BRAA (optional):
`A/C`: “Victory-1 Commit, BRAA”
==AIC==: “Victory-1 group BRAA 020/70 22k, Hot, Hostile, Flogger”
`A/C`: “Victory-1”
>[!quote]- Post Commit (immediately after commit):
![[Pasted image 20230811211403.png|350]]
==AIC==: “Closeout, two groups, Azimuth 15, track south, East group rock 240/35, 22k, Hostile, Flogger, West group 6k, Hostile Flanker”
`A/C`: “Victory-1”